Road closures: six for Arun drivers over the next fortnight

Road Closed signs. Tuesday May 12th 2020Road Closed signs. Tuesday May 12th 2020
Road Closed signs. Tuesday May 12th 2020
Drivers in and around Arun will have six National Highways road closures to watch out for this week.

Drivers in and around Arun will have six National Highways road closures to watch out for this week.

And one of them is expected to cause delays of between 10 and 30 minutes.

Hide Ad
Hide Ad

The latest expected works list, with notes from National Highways, shows that one closure already in place is expected to carry on this week:

A27, from 8pm November 27 to 6am December 4, slight delays (under 10 minutes): A27 both directions Crossbush roundabout to Ford road roundabout, carriageway closure for surface works.

And a further five closures will begin over the next two weeks:

A27, from 8pm December 4 to 6am December 9, moderate delays (10-30 minutes): A27 both directions Portfield to Fontwell, carriageway closure for resurfacing works.

Hide Ad
Hide Ad

A27, from 8pm December 4 to 6am December 5, slight delays (under 10 minutes): A27 westbound, Arundel Road, Lane closure for BT works.

A27, from 8pm December 5 to 6am December 6, slight delays (under 10 minutes): A27 both directions Poling to Clapham, lane closure for drainage works.

A27, from 8pm December 11 to 6am December 16, slight delays (under 10 minutes): A27 both directions Fontwell, carriageway and lane closures for Fontwell, junction improvements.

A27, from 8pm December 11 to 5am December 15, slight delays (under 10 minutes): A27 both directions Ford roundabout to Causeway roundabout, temporary traffic signals for maintenance works.

National Highways is responsible for maintaining motorways and major A-roads, so closures of smaller roads will not be included in their schedule.